Heute 322

Gestern 897

Insgesamt 39396978

Freitag, 29.03.2024
eGovernment Forschung seit 2001 | eGovernment Research since 2001

The work being carried out in Chithirai streets around the Meenakshi Amman temple under the smart city scheme will be completed by December, said minister for cooperation, Sellur K Raju.

The minister said this after inspecting the projects such as cobble stone laying work in Chithirai street, construction of storm water drains and installation of ornamental street lights on Saturday.

Raju said that the cobble stone and storm water drain works are being carried out at Rs 8.57 crore. The storm water collected through the drains will be let into the Vaigai river, just like the drainage system that existed during the Pandya era, he said.

The work on installing about 148 street lights to enhance the beauty of the city and to attract tourists, and ornament lights in Chithirai street, would be completed before Diwali, he said.

Smart city work carried out in Masi streets will come to a halt in a week’s time and will resume only after Diwali, to facilitate shopping.

All the projects carried out under the scheme will be completed and brought to public use before April next year, he said.

Smart city work carried out in Masi streets will come to a halt in a week’s time and will resume only after Diwali, to facilitate shopping.

All the projects carried out under the scheme will be completed and brought to public use before April next year, he said.

---

Quelle/Source: The Times of India, 11.10.2020

Bitte besuchen Sie/Please visit:

Zum Seitenanfang